or so they tell us...
A 115-metre-high wind turbine on the Bruce Peninsula begins listing, facility owners tether it
http://news.nationalpost.com/news/ca...ners-tether-it
For
Against
or so they tell us...
A 115-metre-high wind turbine on the Bruce Peninsula begins listing, facility owners tether it
http://news.nationalpost.com/news/ca...ners-tether-it
ADVERTISEMENT
June 25 8:00
Solar 4Mw (to be expected low, in Canada 2/3 the time it doesn't have sufficient light)
Wind 115Mw or .8%
Demand is 12325 Mw with Hydro at 3,343 Mw and 22.5%
$5,000,000,000+ on wind turbines and it is unreliable, unpredictable and expensive!!